Joist, bearer and blocking take-offs by span and spacing
Structural flooring sheet and decking board quantities
Steel and timber floor system comparisons
Fixing, bracing and connector schedules
Subfloor ventilation and access allowances
Waste and lapping factors applied by material
Send through your framing plans and span tables — we confirm scope and exclusions before we start measuring.
Every joist, bearer and sheet is measured against the drawings, not rounded to a rule of thumb.
Quantities are priced against current regional rates and returned as a clear, itemised estimate.

From a suspended timber floor to a steel-framed commercial deck, we estimate floor and deck framing for builders across Australia, the USA, New Zealand and Canada — matched to local span tables and load requirements.
Request a QuoteSend through your framing plans — most take-offs are returned within 24–48 hours.