Wall frame, top plate and stud take-offs
Roof truss and rafter schedules
Structural steel portal frame and lintel quantities
Bracing, tie-down and connector counts
Timber vs. light-gauge steel cost comparisons
Material grade and treatment specifications
Send through your framing and engineering set — we confirm scope and exclusions before we start measuring.
Every stud, truss and portal frame is measured against the drawings, not rounded to a rule of thumb.
Quantities are priced against current regional rates and returned as a clear, itemised estimate.

Whether the build is timber-framed, steel-framed or a hybrid of both, we estimate the full structural skeleton for builders across Australia, the USA, New Zealand and Canada.
Request a QuoteSend through your framing plans — most take-offs are returned within 24–48 hours.